日韩一级 片内射视频播放蘑菇,真人一级毛片免费的视频,精品国产久一区二区三区,精品三级在线

<td id="sgk9k"></td>
<video id="sgk9k"></video><video id="sgk9k"></video>
<video id="sgk9k"><ins id="sgk9k"><dl id="sgk9k"></dl></ins></video>
      <wbr id="sgk9k"></wbr>
      <wbr id="sgk9k"></wbr>
    <wbr id="sgk9k"><ins id="sgk9k"><dl id="sgk9k"></dl></ins></wbr>
    <video id="sgk9k"></video>
    • Seven Stars Coating Project

      Seven Stars Coating Project
        The first bid of Meishan Qixing Tu Enclosure Project in Beilun District is to build 4100 meters new seawall, North drainage gate and diversion reef gate. The construction time is 008.2-2012.4, and the project cost is about 150 million yuan. The engineering grade is grade III, the main buildings such as embankments and sluices are grade 3, and the damp-proof standard of seawall is once in 50 years.
      • Drainage Project of Chaotang River

        Drainage Project of Chaotang River
          The Chaotang River Drainage Project in Cixi City is a key project in Ningbo City. The project covers 9.4 kilometers from Shuiyunpu in the east to Yangshan Lujiang in the west. The second tender section is the river channel dredging from Sanzao to Liuzaojiang (river pile No. B2+000-B2+900) in Chaotang Jiangxi Province and the related bridges and forks along the river. The project was awarded the Ningbo Water Resources Civilization Standardization Site in 2016, the Ministry of Water Resources Civilization Standardization Site in 2016 and Yongjiang Construction Cup in 2017.
        • Pumping Station Project of Interregional Water Transfer in Luzhong Bay

          Pumping Station Project of Interregional Water Transfer in Luzhong Bay
            Cixi Luzhongwan Inter-regional Water Transfer Pumping Station Project includes the construction of management facilities such as pump house civil engineering, restraint Sluice Reconstruction and expansion, management room and installation of electromechanical equipment (including warehousing, storage and operation), etc. The design flow of pump station is 20 m/s.
          • Zhengxu Reservoir

            Zhengxu Reservoir
              The third tender of Zhengxu Reservoir Phase I Project in Cixi City covers an area of 10,000 mu, with a total reservoir capacity of 42.7 million M and Xingli reservoir capacity of 35 million M. The construction time is 2010.11.15-2013.05.31. The construction time of the second stage project is from 2011.12 to 2013.09. The project was awarded "Ningbo Water Conservancy Civilization Standardized Land in 2015", "Yongjiang Construction Cup in 2015" and "Dayu Award in 2015-2016".